St John Henry Newman Catholic School – Mechanical & Electrical Works
Client: Cubby Group
Architect: Blackbox Architects
Saint Queens Limited was appointed to deliver the mechanical and electrical works as part of improvement and alteration works at St John Henry Newman Catholic School. All works were carried out in coordination with the design team, ensuring compliance, efficiency, and minimal disruption to the school’s operations.
Mechanical Scope:
-
Installation of new rainwater systems and connections
-
Modifications to existing ventilation systems to suit new layouts
-
Heating alterations including pipework adjustments and terminal unit replacements
-
Testing, commissioning, and integration with existing building systems
Electrical Scope:
-
Installation of small power and general electrical services
-
LED lighting and emergency lighting installations
-
Data and communication cabling infrastructure
-
Access control system upgrades
-
Fire alarm system alterations and testing
-
Final testing, certification, and handover
The project was successfully delivered on time, within budget, and to the satisfaction of both the client and design team. Saint Queens Limited maintained strong communication, proactive coordination, and high-quality workmanship throughout, ensuring the completed systems met all performance, safety, and compliance requirements.